For the situation with dead time and constraints, a control strategy of increment model algorithm was developed using goal programming as optimal strategy.
针对纯时延和有约束的情况,应用目标规划作为优化策略,提出了一种增量型模型算法控制策略。
At last the paper USES a case to explain the solving procedure of goal programming model based on knowledge.
最后结合案例进一步说明了基于知识的目标规划模型的求解流程。
In this paper are presented the goal programming model for course construction and the reflection P-space algorithm of the system.
本文给出该系统的课程建设目标规划模型及其反射p空间算法。
应用推荐