Welcome to Nanjing Metro Line S1. This train is heading to Lukou International Airport Station. The whole trip takes about 35 minutes.
欢迎乘坐南京地铁S1号线,本次列车开往禄口国际机场站,全程耗时约35分钟。
TA11 bid for first stage of Nanjing Metro Line 2 is constructed with shield method, including Yixianqiao, Daxinggong and Xinjiekou stations.
南京地铁2号线一期工程TA11标包括逸仙桥站—大行宫站—新街口站,采用盾构法施工。
With the construction of Nanjing metro Line 1 as the background, this paper introduces a design option for the Passenger Information System (PIS) in metro stations.
结合南京地铁1号线建设,介绍地铁车站乘客信息系统的一种设计方案。
应用推荐