In the course of these new developments the design of the entire simulator equipment and the Instructor Operating Station (IOS) have been improved and adapted to ergonomic requirements.
在新的开发过程中,整个仿真设备和指令操作站(IOS)的设计经过了改善,满足人类环境改造学的要求。
Instruments may sound alarms as advance warnings of conditions requiring action to avoid damage to equipment operating beyond its design limitation.
仪器可以使警报器发声,作为需要采取行动避免运行于设计极限之外的设备损害等条件的事前警报。
The design, construction and operating condition of grounding equipment affect not only safety operation of power system but also electromagnetic interference of substation.
接地装置的设计施工及运行情况的好坏不仅影响电力系统安全运行,也是影响变电站电磁干扰的重要方面。
应用推荐