Considering the thick backfill and soft foundation soil in the cut-and-cover section of Jiadi tunnel, a pile-raft foundation is accepted in order to avoid negative effect due to excessive settlement.
浃底隧道出口明洞段回填厚度较大而基础土体软弱,因此采用了桩-筏基础的形式以避免过大沉降带来的不利影响。
A settlement computation method to the composite foundation composed of slurry wall-pile-box or thick raft is proposed, which is defined in the paper as two-stage settlement computation method.
提出了由地下连续墙-桩-箱或筏所构成的复合基础的沉降计算方法,该方法定义为二阶段沉降计算方法。
A method is proposed for the settlement and inner force analysis of rigid pile composite foundation raft system.
提出一种分析刚性桩复合地基—筏板基础相互作用体系内力和变形的实用方法。