Then it also discusses the general process of schedule control, which including three steps, action preparing, process monitoring and controlling, project results evaluation.
然后讨论了项目进度控制一般过程,包括准备行动程序、过程监测与控制以及最后项目评估三个阶段并对其进行分析。
Then based on the process of the coal-bed methane power generation and the control demand of the project, structure design and software constitution of the monitoring system are proposed.
基于煤层气发电生产工艺流程以及项目的控制要求,提出了煤层气发电生产过程监控系统结构及系统软件组成;
Systematic monitoring work is arranged for the project, the deformation on expressway and the box posture control are focused on the whole jacking process.
在高速公路路面和箱涵布置大量监测点,重点对路面位移和箱涵顶进姿态进行监测。