The fume turbine in an ARGG plant of an oil refinery had a low power recovery after putting into operation.
某炼油厂一套ARGG装置烟气轮机运行后,回收功率较低。
Good overall stability of the equipment, cost effective with less secondary waste after putting into operation.
设备的整体稳定性好,性价比高,投产后二次浪费少。
Through putting into operation, it is proved that the gauging and control methods are reliable and have good effect.
系统经投产使用证明,这种计量控制方法是可行的,且效果很好。
应用推荐