The advance LOSM method was applied to the risk analysis and evaluation of flood forecast model, and this method was the same with the medium-term and long-term hydrological forecasting.
同时认为,该方法同样适用于中长期水文预报风险率的计算。
参考来源 - 防洪及水资源利用风险分析问题的研究This dissertation gives the design of the software risk management system and the detail design on risk analysis process, in which the neural network method is used to estimate the synthetic project risk.
最后,本文给出了软件项目风险管理系统的整体设计和风险评价模块的设计与实现过程。
参考来源 - 软件风险管理系统关键技术的研究与实现·2,447,543篇论文数据,部分数据来源于NoteExpress
以上来源于: WordNet
应用推荐