The span will have a single, 525-foot tower, anchored to bedrock and supported by a single, enormous steel-wire cable that threads through the suspension bridge.
大桥将会有一个固定在基岩之上的高达525英尺的桥墩,并且由一根单一的,巨大的钢缆通过吊桥的全程。
This method can be used in form-finding and construction control on main cables of suspension bridge and other long-span cable structures.
该方法不仅可以应用于悬索桥主缆的找形,同样也适用于其它大跨缆索结构的找形和施工控制。
Authors presented main cable safety factors assessment of long-span suspension Bridges based on inverse reliability method.
提出了一种基于逆可靠度法的大跨悬索桥主缆安全系数评估方法。
应用推荐