After the system change of capital centralization was done, the main economic incentive was nonmaterial, and the transaction cost was the planning cost.
资本集中化制度变迁后,经济活动以非物质激励为主,交易成本表现为计划成本。
Evaluating economic incentive policy of building energy efficiency is a system engineering in which many ingredients are involved. Currently, it is common to use single index.
建筑节能经济激励政策评价是一个涉及多因素的系统工程,目前常用的方法一般是侧重于单一指标。
Based on the incentive theory and economic analysis of law in economics, studied is the mill supervision system for oil and gas pipeline, and discussed are its necessity and rationality.
采用经济学中的激励理论和法律的经济分析方法,对驻厂监造制度进行了研究,对驻厂监造制度为什么存在和存在的必要性、合理性进行了探讨。
应用推荐