The structural core of the project is a raised flooring system with a series of columns and a ring beam on the top for stability.
项目的结构核心部分是一个抬高的顶棚系统,附带依次排列的圆柱以及置于其上用来增强稳定性的一根圆形横梁。
Thus, different mining methods, different block structural parameter and different drawing way influence the stability of mining system.
因此,不同的采矿方法、不同的采场结构和回采方式,对地下采矿系统的稳定性都有着直接的影响。
This paper shows the effects of bifurcation in the slow subsystem and the fast subsystem on structural stability of generalized system.
分析了广义系统中快、慢子系统分岔对系统结构稳定性的影响。
应用推荐