Design data is reviewed by an approved engineer not responsible for the generation of the original document and approved by the Engineering or Technical Director.
设计资料的评审工作,由经认可的,未参与原始文件编制工作的工程师负责,并且设计资料应由工程总监,或技术总监进行核准。
Liaise with all China customers answering all questions with assistance from Technical Director, Design Engineer, Purchasing Officer and Quality Manager as required.
联系所有中国内客户并在“技术总监”、“设计工程师”、“采购人员”以及“质量经理”的协助下回答客户提出的所有问题。
Through the experimental section research, will build the solid foundation and the technical reserve for the later road engineer synthesis drainage system design.
通过试验段的研究,为以后道路工程综合排水系统设计打下坚实的基础和技术储备。
应用推荐