It is indicated that the dynamic amplification of abutment rock body and dam-water-foundation interaction should be considered in the aseismatic stability analysis for high arch dam abutment.
指出高拱坝坝肩稳定分析应考虑坝肩岩体的动力放大和坝-地基-库水的动力相互作用,算例表明所提方法的实用价值。
According to the analysis of simulation results compared with BP algorithm, this algorithm has the advantage of the fine stability, fast convergence speed and high precision.
通过与BP算法的仿真结果比较分析,发现该算法具有稳定性好,收敛速度快,预测精度高的特点。
应用推荐