save the construction time 节省施工时间
Now confirming the construction time 现在向您确认施工时间
Having adopted such technique, the tower wall construction speed was increased by 35% and the construction time was reduced by 17 days without increasing costs.
实施该工艺后,在未加大成本的前提下,提高筒壁施工速度35%,缩短工期17天。
Using some special technical measures, they saved construction costs and shortened the construction time.
通过采用特殊的技术措施,节约了工程成本,缩短了施工工期。
By design of the change node and use of multifunctional climbing-frame, the construction time is reduced greatly.
通过改变节点设计及采用多功能爬架施工大大缩短了施工工期。