An economic management model of the system and optimization technique are developed.
提出了系统的经济管理模型与相应的优化技术。
Using increment analysis, the law of changing economic factors, such as cost, price, discount rate, etc, to influence the model optimization could be studied under different planting measures.
运用增量分析方法,研究不同栽培措施下,成本、价格、折现率等经济因素变化对栽培模式优化的影响规律。
Mining Scheduling System model is mainly used for the optimization of drilling-blasting technical and economic parameters of different platforms.
矿山开采调度系统主要解决不同平台开采的穿孔爆破技术经济参数优化问题。
应用推荐