cumulative total lead time 累计总提前期
总铅的时间了该项目。
Total lead time for an end item, calculated by taking the individual lead times for all items on the critical path through all levels of the bill of material.
最终产品的总共前置时间,以物料清单各层要径所有产品前置时间计算得出。