Fifth chapter introduced the local railway construction project uncertainty factor analysis and the synthetical evaluation.
第五章介绍了地方铁路建设项目不确定因素分析及综合评价。
The mechanism of LOOP is complex and includes the plant internal and external initiators. Some specific factor such as weather which causes the LOOP, its analysis method still has large uncertainty.
由于LOOP事件的发生机理复杂,涉及核电厂内部和外部初因,其中一些特定因素如电厂外部的灾害性天气,其分析方法仍存在较大不确定性。
Two dimensions of uncertainty orientation of college students are found: tolerance and finding novelty, and the same of uncertainty response: comfort and resolve, after factor analysis.
采用因素分析的方法得到大学生不确定倾向有两个维度:容忍和求新,不确定反应有两个维度:舒适和解决。
应用推荐