In this paper a model for the whole process of soil compacted by dynamic compaction is proposed and the problems of two ultimate void ratios are discussed.
提出一个强夯中土体被夯实的全过程模型,讨论了两个极限孔隙比问题。
To ensure stability of the whole structure of steel-lined, grouting is always applied into void treatment in which chemical grouting was supplementary for cement grouting.
为保证钢衬整体结构的稳定性,通常都对脱空进行接触灌浆,一般以水泥灌浆为主,化学灌浆则用于水泥灌浆后的辅助补强。
应用推荐