This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
对华能玉环电厂1 000 MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc. must be solved before the construction of the power plant.
电厂取水口建掩护堤后,取水口、取水渠等处的回淤必须在电厂建设之前予以解决。