... 土地资源管理 » Land resource management 风栅接头 » Wind grid connection 都要修建很多新路 » To build many new road ...
基于12个网页-相关网页
Some wind farms have been unable to start operating because of a lack of grid connection or were operating at levels lower than planned.
一些风力发电场由于电网无法接入或者运转能力低于原计划而无法启动。
With the increasing capacity of wind power generators, the current impact on grid connection could not be ignored, thus the grid connection techniques should be investigated in depth.
随着风电机组单机容量的不断增大,发电机并网时的电流冲击已不能忽视,必须对并网控制技术进行深入研究。
Then control strategy of microgrid-connection with no load is formulated to realize flexible grid-connection of wind power system.
制定双馈风力发电机空载并联微电网的控制策略,实现风力发电系统柔性并网控制;
应用推荐