Combined with precipitaton forecast and flood forecast, the upper bound ofdynamic control on limit water level of Huanren Reservoir in flood season was determined.
在此基础上,联合降雨预报和洪水预报确定了桓仁水库动态控制汛限水位的上限。
Gaobazhou project is the reverse regulation reservoir of the upstream Geheyan project, and its flood control operation will be carried out in coordination with Geheyan reservoir.
高坝洲水利枢纽是上游隔河岩水利枢纽的反调节水库,洪水调度将与隔河岩水库联合运行。
The establishment of consultation decision-support system for flood control of Zhangze Reservoir is based on 3S technology. It builds 12 sub-systems combining with relevant hydrodynamic models.
漳泽水库防汛会商决策系统的建设以3S技术为依托,配合相应的水动力模型,建立了12个子系统。
应用推荐