以上来源于: WordNet
Some wind farms have been unable to start operating because of a lack of grid connection or were operating at levels lower than planned.
一些风力发电场由于电网无法接入或者运转能力低于原计划而无法启动。
Power quality monitoring for the grid connection point of wind power generator and adapting corresponding treatments can reduce the influence of the grid-connection to power network.
对风力发电机组并网点进行电能质量监测并由此采取相应的措施治理,可以降低并网对电网的影响。
With the increasing capacity of wind power generators, the current impact on grid connection could not be ignored, thus the grid connection techniques should be investigated in depth.
随着风电机组单机容量的不断增大,发电机并网时的电流冲击已不能忽视,必须对并网控制技术进行深入研究。
应用推荐