The in-situ monitoring is made on the disturbance of soil induced by pipe jacking construction.
2.对顶管施工引起的土体扰动进行了现场监测,研究了顶管工程现场测试技术。
参考来源 - 顶管施工中土体性状及环境效应分析The displacements of parallel buried pipelines induced by pipe jacking are analyzed by 3D-FEM.
采用三维有限元方法分析了顶管施工引起的相邻平行地下管线的位移。
参考来源 - 期刊学术社区·2,447,543篇论文数据,部分数据来源于NoteExpress
N a method of laying underground pipelines by assembling the pipes at the foot of an access shaft and pushing them through the ground 管子推顶法
The construction of Pipe Jacking is beset with difficulty due to the large propulsive force for several years.
大口径长距离顶管施工顶进推力过大是困扰顶管施工多年的技术难题。
Because of the advantages and application fields, curved pipe jacking technology is paid more and more attention.
曲线顶管施工技术以其特有的优势和应用领域,越来越受到重视。
With the environment getting more attention, the use of not-dig pipe jacking technology has become more extensive.
随着环境问题越来越受到重视,作为非开挖的顶管施工技术应用也越来越广泛。