·2,447,543篇论文数据,部分数据来源于NoteExpress
stabilization pond
In the second phase, after the mining subsidence is gradually stabilization, we bring into bear different load in the different location of subsiding basin, and we study ground stability with goaf.
第二阶段在开采沉陷基本稳定之后,在沉陷盆地的不同位置施加大小不同的建筑物荷载,研究其地基的稳定性。
youdao
应用推荐
模块上移
模块下移
不移动