14.00 会间的任务 Tasks During the Meeting 14.30 会后的工作与跟班 Following Up Tasks After the Meetings ..
基于15个网页-相关网页
During the planning meeting, for each user story in the iteration backlog, the team needs to break down all the tasks required for the story to be considered complete.
在规划会议期间,对于迭代开发计划安排中的每一个用户描述,团队需要分解所有必需的任务,以便对描述进行详细周到的分析。
Technical Leads will prep "the iteration plan" pre-populating it with tasks, estimates and assignments all in the name of saving time during the planning meeting.
在计划会议时,技术组长就预先将任务、估算和指派等拼装成“迭代计划”,并美其名曰“节省时间”。
应用推荐