• Control of saturation line is one of important points in tailing dam monitoring, which plays an important role in tailing dam safety.

    浸润线的控制是尾矿库监测重点内容之一,对尾矿库安全起着至关重要的作用。

    youdao

  • Among the factors affecting the safety of upstream method-tailing dam the seepage field is one of the most important.

    影响上游法尾矿坝安全的各种因素中,渗流场是极为重要的因素之一。

    youdao

  • The test results provide basic data for the stability evaluation of the Yangla copper tailing dam under a magnitude 8 earthquake.

    为羊拉铜矿尾矿坝在8度地震作用下的稳定性分析提供了基础资料。

    youdao

  • It is pointed out that safe sealing for the flood drainage system of the tailing dam has a direct influence on the safety of the tailing dam.

    指出尾矿库的排洪系统能否安全封堵直接影响到尾矿库的安危。

    youdao

  • Frequently check the drainage chute in the back part of the tailing dam, clear away the soil and stone, etc. on its both sides to avoid entry into the chute.

    尾砂坝后部排水斜槽,要经常检查,清理两边的土、石等物防止进入槽内。

    youdao

  • The calculation methods for common dam-break water flow are studied, such as the average width of dam-break, the maximum flow at tailing dam and the flow graph at tailing dam.

    研究了常见溃坝水流计算方法,例如溃口平均宽度、坝址最大流量、坝址流量过程线等。

    youdao

  • Planting grass on tailing dam is one of the effective ways for the safety and management of the tailing dam, this not only makes the dam wind resistant, but also beautifies the environment.

    在尾矿坝植被种草,是对尾矿坝进行安全管理行之有效的方法之一,它不仅可以防风固砂,同时还起到美化环境的作用。

    youdao

  • Red mud is the high alkaline tailings from the production process of alumina, the tailing dam of red mud has adverse environmental impacts and its vegetation construction can be very difficult.

    赤泥是氧化铝生产中排出的高碱性尾矿,赤泥堆场对环境造成不良影响,植被恢复困难。

    youdao

  • The seepage stability of tailing dam is of great importance to the dam structure stability and therefore, the analysis of seepage field is an important content of tailing dam engineering research.

    尾矿坝的渗流稳定对结构稳定有重要影响,渗流场分析是尾矿坝工程研究的重要内容。

    youdao

  • After assuring the slope stability, we study the vegetation choice and the recovery vegetation, derive the project procedure and the technical key of recovery vegetation in the tailing-dam.

    在边坡稳定性得到保证之后,对边坡的植被选择和复垦技术进行了研究,得出了进行尾矿坝复垦的工程步骤和技术要点。

    youdao

  • After assuring the slope stability, we study the vegetation choice and the recovery vegetation, derive the project procedure and the technical key of recovery vegetation in the tailing-dam.

    在边坡稳定性得到保证之后,对边坡的植被选择和复垦技术进行了研究,得出了进行尾矿坝复垦的工程步骤和技术要点。