tailing-dam 尾矿坝
high tailing dam 高尾矿坝
tailing dam security 尾矿库安全
Tailing dam stability 尾矿坝稳定
tailing dam evaluation 尾矿坝评价
Tailing dam of Baotou 包头尾矿坝
construction of tailing dam 尾矿筑坝
high tailing dam foundation 高尾矿坝地基
Li Xi tailing dam will be liquefied partly, might enable dam come down in earthquake.
栗西尾矿坝在地震过程中局部发生液化,可能使坝体产生滑坡。
参考来源 - 尾矿坝的动力稳定性分析The tailing dam is designed with height of 185m, which is the second high-central line tailing dams in our country. In this paper, tailing dam engineering is set as research object.
本文以该尾矿库工程为研究对象,采用室内试验和数值模拟技术,对中线法高堆坝在地震作用下的动力响应特性进行了系统研究。
参考来源 - 中线法筑堆尾矿坝动力反应分析·2,447,543篇论文数据,部分数据来源于NoteExpress
Control of saturation line is one of important points in tailing dam monitoring, which plays an important role in tailing dam safety.
浸润线的控制是尾矿库监测重点内容之一,对尾矿库安全起着至关重要的作用。
Among the factors affecting the safety of upstream method-tailing dam the seepage field is one of the most important.
影响上游法尾矿坝安全的各种因素中,渗流场是极为重要的因素之一。
The test results provide basic data for the stability evaluation of the Yangla copper tailing dam under a magnitude 8 earthquake.
为羊拉铜矿尾矿坝在8度地震作用下的稳定性分析提供了基础资料。
应用推荐