Therefore, many algorithmic methods are geared for cost estimation.
因此很多算法方法都面向费用评估。
Reliable software cost estimation is not only about using the right tools and techniques.
软件成本评估的可靠性不仅仅与使用正确的工具和技术有关。
A cost estimation that assumes normal data distribution may not best reflect the real cost of a query when different parameters are used.
假定正常数据分布的开销评估可能并不能最好地反映查询使用不同参数时的实际开销。
This includes information such as response time, an SQL statement's count of that transaction, cost estimation, sorting statistics, locking related details, and so on.
这些信息包括响应时间、此事务的sql语句计数、估计的成本、排序统计数据、与锁相关的详细信息等等。
Software size measurement is the base of effort estimation, cost estimation and project plan.
软件规模度量是估算软件项目工作量、成本和合理策划项目进度的基础。
Present techniques on software cost estimation are summarized and compared.
对当前流行的软件成本估算技术进行分析和比较。
A method for software cost estimation and risk assessment is presented in this paper.
论文提出了一种用于软件成本估计以及风险评估的方法。
The software cost estimation is an essential part of the software engineering project management.
计算机软件成本估算是软件工程项目管理的一项重要工作内容。
The equipment research cost estimation model is constructed by learning from the typical samples.
在此基础上通过对典型样本的学习,建立装备研制费用预测模型。
Fees to the executive architect or general contractor for cost estimation are not part of this agreement.
支付给总建筑师或总承包人进行成本估算的费用不属于本协议范围。
There are three main methods of cost estimation: expert method, analog method and parameters model method.
成本估算主要有三种方法:专家判定法、类比法、参数模型法。
Design Consultant will consult with the executive architect or general contractor to develop cost estimation.
设计顾问将就成本估算的编制与总建筑师或总承包人进行商讨。
The subjectivity and redundancy of inputs are key obstacles to the application of software cost estimation models.
输入的主观性以及输入过多是妨碍软件成本估算模型实际应用效果的重要影响因素。
Virtually all cost estimation is performed according to one or some combination of the following basic approaches.
实际上,所有的估价活动都是基于以下这些基本方法中的一种或几种方法的组合。
Expense oriented construction planning and control focuses upon the categories included in the final cost estimation.
以费用为导向的建设项目计划和控制,侧重包含在最终成本估算内的成本项次。
A model based on function for product cost estimation was proposed based on the literature review on the design for cost.
在分析并行工程中面向成本设计的基础上,提出了基于功能的产品成本估算模型。
It is sorely urgent to develop an efficient and applicable method of cost estimation for construction cost in the AEC industry.
因此,探寻一套快速、简捷、实用的工程造价估算方法已成为建筑行业的迫切需要。
Software cost estimation is an important process of managing software and also the difficult issue in software project planning.
软件成本估算是软件项目管理的关键步骤,也是软件项目计划的难点。
Regarding the rock mass classification, for design and project cost estimation, it should be different from those in bore & blast.
设计和工程造价中关心的围岩分类应区别于传统的钻爆法。
The development cost of quick cost estimation methods was low and process of them was quick, but their precision was unsatisfactory.
快速成本估算方法虽然开发成本较低、估算过程快速,但其精度欠佳。
The cost constitution of mechanical product is complicated, and it is quite necessary to carry out cost estimation in the stage of design.
机械产品的成本构成复杂,在其设计阶段进行成本估计十分必要。
This paper inquires into the contents and method for compiling the general cost estimation for foreign -financed port construction projects.
就利用国外贷款港口建设项目总概算的编制内容与方法进行探讨。
Accurate cost estimation and effective cost control can accumulate financial power and strengthen competition ability of software enterprise.
准确的成本估算和有效的成本控制可以更好的为软件企业积蓄财力,可以增强软件企业的竞争力。
Software cost estimation is the most important chain of software project management and is important basement of software cost management, too.
软件成本估算是软件项目管理中的重要环节,也是软件项目成本管理的重要基础和依据。
The thesis is to present a cost estimation method and pricing model through the study on the characteristics of mass customized product and its pricing.
本文旨在通过对大规模定制生产、产品及其报价特点的研究,提出大规模定制产品的成本估算方法和报价决策模型。
In the former software cost management, the cost estimation methods have some problems, such as subjective experience's effect, uncertain estimation and so on.
在以往软件成本管理中,在成本估算方法方面存在着主观经验影响大,估算不准确等问题。
In the former software cost management, the cost estimation methods have some problems, such as subjective experience 's effect, uncertain estimation and so on.
在以往软件成本管理中,在成本估算方法方面存在着主观经验影响大,估算不准确等问题。
A general framework of reliability cost estimation and optimization is given, which puts the problem of reliability cost into the field of cost-benefit analysis.
从效费分析的角度考虑了可靠性费用的建模与优化问题,提出了一种可靠性费用建模与优化的综合方法。
A general framework of reliability cost estimation and optimization is given, which puts the problem of reliability cost into the field of cost-benefit analysis.
从效费分析的角度考虑了可靠性费用的建模与优化问题,提出了一种可靠性费用建模与优化的综合方法。
应用推荐