• The Contractor shall design, engineer, and construct the Plant at the Site.

    承包商应负责设计、筹划以及在工地上建造工厂。

    youdao

  • The Contractor shall prepare a detailed test plan and schedule.

    承包商应准备一份详细的试验方案与时间进度表。

    youdao

  • The Contractor shall make at his own cost any further copies required by him.

    承包商需要更多复制件时,其费用自行负担。

    youdao

  • The contractor shall always refer to manufacturer's Material Safety Data Sheet.

    承包方应参考厂家提供的材料安全数据表。

    youdao

  • The Contractor shall not make any such variation without an instruction of the Engineer.

    没有工程师的指示承包商不得作任何变更。

    youdao

  • The contractor shall maintain all tools and test equipment to new equipment specification.

    承包方应按照新设备规格维护所有的工具和测试设备。

    youdao

  • The Contractor shall then prepare and submit to the Employer the final statement as agreed.

    然后,承包商应按商定的意见编制并向雇主提交最终报表。

    youdao

  • The Contractor shall supply the Owner with the maintenance equipment specified in Appendix...

    承包人应该给业主提供附录中指定的设备。

    youdao

  • The Contractor shall supply the Owner with the maintenance equipment specified in Appendix...

    承包人应该给业主提供附录中指定的设备。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定