• According to the result of 15 years monitoring, the deformation, seepage and stress-strain of the high slope and the navigation lock during construction and operation periods are analyzed.

    根据15监测成果施工运行高边坡船闸变形渗流应力应变等进行分析。

    youdao

  • According to the result of 15 years monitoring, the deformation, seepage and stress-strain of the high slope and the navigation lock during construction and operation periods are analyzed.

    根据15监测成果施工运行高边坡船闸变形渗流应力应变等进行分析。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定