According to the result of 15 years monitoring, the deformation, seepage and stress-strain of the high slope and the navigation lock during construction and operation periods are analyzed.
根据15年的监测成果,对施工及运行期高边坡和船闸的变形、渗流和应力应变等进行分析。
According to the result of 15 years monitoring, the deformation, seepage and stress-strain of the high slope and the navigation lock during construction and operation periods are analyzed.
根据15年的监测成果,对施工及运行期高边坡和船闸的变形、渗流和应力应变等进行分析。
应用推荐