Construction project cost control and claims is intended to reduce project costs, increase economic efficiency.
施工项目成本控制和索赔的目的,在于降低项目成本,提高经济效益。
With the increasing of municipal construction projects, project cost control has become more and more important.
随着市政工程建设项目日渐增多,工程成本控制越发显得重要。
To solve those problems, the author states that: there should be a dynamic management of the overall project cost control.
针对问题,本文指出:工程造价控制必须采用全过程动态控制。
This paper discusses the key issues of cost control, and detailed analysis of the whole process of project cost control focus.
本文论述了工程造价控制的主要问题,并详细的分析了工程项目造价全过程控制的重点。
This paper discusses construction project cost control on cost control in the stage of construction and completion settlement.
本文对工程施工和竣工结算阶段工程造价控制进行了探讨。
Combined with some project item, the systematized knowledge and basal theory on project cost control are introduced on the section.
与项目结合介绍了项目成本管理知识体系和项目成本控制理论基础。
Under the whole life cycle theory, I think I study the design phase and bidding phase of the two key nodes in the project cost control.
笔者在全寿命周期理论的视角下主要研究决策设计阶段和招投标阶段两个关键节点的工程造价控制。
Therefore, the high-speed railway construction enterprises must carry out the project cost control in order to ensure economic efficiency.
因此,高速铁路施工企业必须进行项目成本控制,才能保证经济效益。
Abstract: Project cost control runs through the whole process of engineering construction, the completion phase is a key of control of cost.
摘要]工程竣工阶段是工程建设的最后阶段又是工程最终造价的形成阶段,竣工结算审核是造价控制的关键。
Abstract: Design stage is a key link of project cost control, but there is no appropriate method which is advanced in theory and easy in operability.
摘要设计阶段是项目成本控制的关键环节,但该阶段成本控制缺乏理论先进、操作性强的方法。
They are designed to provide advisory services, project cost control, engineering and equipment, material bidding. project management consultancy services.
为所服务项目提供设计咨询,工程成本控制,工程及设备、材料招投标,工程项目管理等顾问服务。
Construction project cost control and management of building construction is an important part of management, all projects should be given enough attention.
建筑工程造价控制与管理是建筑工程建设管理的重要组成部分,应该得到工程各方的足够重视。
The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.
工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。
The paper introduced the principle of engineering project cost control, forecast of the cost, the effective way of reducing the cost and the determination of cost control goal.
介绍了工程项目成本控制的原则,成本的预测,降低成本的有效途径及成本控制目标的确定。
In this paper, the purpose of the project cost control and the role of, in principle, cost control approach described several aspects of light construction projects cost control.
本文从项目成本控制的目的和作用、原则、成本控制途径几个方面浅述施工项目的成本控制。
Finally, puts forward attention notes to control cost through subdivision of technical risk of construction projects, and provides the reference to construction project cost control.
最后提出基于建筑工程风险细分进行项目成本控制应用的注意点,为建筑工程项目成本控制提供参考。
Then, based on the analysis of project cost management status and the existing problems of power supply company, the project cost control methods for power supply company are displayed.
通过分析供电公司工程造价管理现状及存在问题,研究并得出了供电公司工程造价控制的方法。
According to the characteristics of the project management generally adopted. The construction enterprise must attach importance to the financial management and the project cost control.
根据施工企业普遍推行项目管理的特点,为取得良好的企业效益,施工企业必须重视财务管理和项目成本控制。
Project management is a main method to managing Architectural Engineering, project cost control is one of the "three main targets control" in Architectural Engineering project management.
项目管理是实施建筑工程管理的主要手段,项目成本控制又是建筑工程项目管理中“三大目标控制”之一。
The paper analyzes the application scope; earned value calculation, cost prediction of earned value management in overseas oil exploration and development of project cost control project.
就海外石油勘探开发项目成本控制中挣值管理的适用范围、挣值计算、成本预测等进行了分析。
For the implementation of the cost planning, the thesis explained how to conduct the project cost control from the material costs, labor costs, machinery costs, time costs and quality costs.
成本计划的执行方面,从材料成本、人工成本、机械成本、工期成本、质量成本几个主要方面讲述了如何进行项目成本制约。
Construction equipment installation project cost control process, the key should be in the design process, construction process and settlement of the audit process for strict and effective control.
建筑设备安装工程造价的过程控制,关键应在设计过程、施工过程及结算审核过程中进行严格有效的控制。
For the overall project cost control in terms of the construction project cost control can be classified as: cost projections, cost control, cost accounting, cost analysis and cost assessment aspects.
工程成本制约来讲,可以将施工项目成本制约划分为:成本预测、成本制约、成本核算、成本分析和成本考核几方面。
Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.
质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
The engineering project is the construction enterprise effectiveness of operation source and the cost control center.
工程项目是施工企业经营效益的源头及成本控制的中心。
These problems could make the software project lose control on quality, plan and cost and make bad result at last.
这些问题将会使软件项目在质量、进度、成本等方面失去控制,最终导致失败。
The paper analyses the problems existing in cost control at design stage and presents the corresponding measures to realize the objective of project management.
分析目前设计阶段造价控制存在的问题,根据存在的问题提出相应的措施,以保证项目管理目标的实现。
The paper analyses the problems existing in cost control at design stage and presents the corresponding measures to realize the objective of project management.
分析目前设计阶段造价控制存在的问题,根据存在的问题提出相应的措施,以保证项目管理目标的实现。