The results indicate that the structure's seismic applicability will be worse if the tie beam is set.
研究表明,设置系梁后结构抗震适用性反而降低。
The installment of tie beam of pier in high earthquake intensity regions was studied in the view of improving seismic performance of bridges.
从提高桥梁抗震性能的角度出发,研究了高烈度区桥墩系梁的设置问题。
By analysing the bearing condition of pier cap and foundation beam (tie beam), this article gives the design approach of pier cap and foundation beam (tie beam).
通过分析墩帽及基础梁(拉梁)的受力状态,提出了墩帽及基础梁(拉梁)的设计方法。
By analysing the bearing condition of pier cap and foundation beam (tie beam), this article gives the design approach of pier cap and foundation beam (tie beam).
通过分析墩帽及基础梁(拉梁)的受力状态,提出了墩帽及基础梁(拉梁)的设计方法。
应用推荐