• The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant's No. 2 unit are described.

    介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。

    youdao

  • "Proper use" means installation, commissioning, operation and maintenance in accordance with the Contractor's advice and good engineering practice.

    “正确使用”系指根据供应方的建议和良好工程实践进行的安装、调试、操作和维护。

    youdao

  • "Proper use" means installation, commissioning, operation and maintenance in accordance with the Contractor's advice and good engineering practice.

    “正确使用”系指根据供应方的建议和良好工程实践进行的安装、调试、操作和维护。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定