The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant's No. 2 unit are described.
介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。
"Proper use" means installation, commissioning, operation and maintenance in accordance with the Contractor's advice and good engineering practice.
“正确使用”系指根据供应方的建议和良好工程实践进行的安装、调试、操作和维护。
"Proper use" means installation, commissioning, operation and maintenance in accordance with the Contractor's advice and good engineering practice.
“正确使用”系指根据供应方的建议和良好工程实践进行的安装、调试、操作和维护。
应用推荐